’Worth Every Nickel’’


Reports

As a part of “Project Tiger Cub’’ at the Stanlow refinery of Essar Oil UK Ltd, there was a requirement to replace and upgrade a key component part within the Fluid Catalytic Cracking Unit (FCCU) during the planned turnaround event in January 2018. As a part of the replacement program it was necessary to join a new 1 ¼ Cr ½ Mo vessel to an existing CrMo vessel that had been in elevated temperature service for in excess of 30 years. The section thickness and diameter at the connection is 65 mm × 1,650 mm.
Pages: 204 - 207: